The project included the cleanup and restructuring of the Active Directory and the file system over a period of 24 months.
The main goals were to revise a complex directory structure that had grown over 20 years, to redesign authorizations and to ensure audit-proof data archiving. Key challenges included dealing with structures and permissions that were too deep, long paths that prevented files from being opened, and a large proportion of outdated data.
The solution strategy included archiving obsolete data, removing outdated permissions, building new permission structures and moving data into a new, flatter structure.
The concept of data separation was implemented to optimize and manage the directory structure.
Challenge:
- Confusing directory structure that has grown over 20 years
- To deep structures and permissions
- Files can no longer be opened because the path is too long
- 80% of all data is older than 2 years
- Data must be stored in an audit-proof manner for a long time
- In the future, authorization management will be managed by owners via the IAM system
- High level of documentation and traceability of all actions in the project
Solution:
- Structures were coordinated and adjusted together with specialist departments (analyzer)
- Obsolete data was archived with DataRetention
- Obsolete authorizations are identified and automatically removed
- Permissions have been completely rebuilt (migRaven.one)
- Data was transferred to a new, clear (flat) structure (migRaven.one)
- Links between documents were automatically repaired (Linkfixer)
- Permanent directory optimization through data separation based on the DataRetention concept was established (migRaven.24/7 DR + API for connecting Quest Identity Manager)
- Complete project management and control of all migration steps migRaven.one Task management and workflow
Project duration:
24 months
Tools used:
- migRaven.one
- migRaven.24/7 Analyzer
- migRaven.24/7 Data retention
- migRaven.24/7 API
- link Fixer
Fact Sheet
- Industry: Finance
- Project: Clean-up AD and file server
- Technology: MS file system
- Runtime: 24 months
- Used software
- Runtime: 9 months


